Full foundation prep completed with installed rebar and formwork. Plumbing risers positioned at strategic locations for vertical connections.
Foundation trenching is underway with visible plumbing rough-ins and framing boards outlining the slab layout for a new home addition.
Foundation prep captures excavation, demolition, and foundation layout with visible formwork preparation and trenching. The images show structural integration with framing elements in an active residential addition.
Master Bathroom Tile and Shower Installation
tile installation and finishing work in the new master bathroom. The work includes flooring, shower assembly, and decorative feature wall detailing.
Shower Rough-In and Waterproofing Preparation
our professional tile work shows plumbing rough-in and waterproofing applied to the shower base in the master bathroom. The work prepares the area for wall board installation and tile finishing.
Interior Finishing and Window Installation
completed drywall phase with installed window in the new addition. The space is prepared for flooring, trim, and final finishes.
interior Room Preparation and Drywall Finishing
drywall finishing and floor preparation in a newly constructed interior space. The room is staged for flooring installation and final trim work.
Exterior Stucco and Finishing Phase
stucco application and finishing work on the newly constructed home addition. The process includes exterior coating, texture application, and final surface detailing.
Exterior Wall Framing and Sheathing Installation
work on the wall framing and sheathing installation for the new home addition. The work includes structural tie-ins and preparation for window and door openings.
FLOOR FRAMING INSTALLATION FOR ADDITION
FLOOR JOIST INSTALLATION AND STRUCTURAL FRAMING FOR THE NEW RESIDENTIAL ADDITION. THE LAYOUT DEFINES LOAD PATHS, SPACING, AND INTEGRATION WITH THE EXISTING ELEVATED STRUCTURE.
CONCRETE FOUNDATION WALLS INSTALLATION
NEWLY POURED FOUNDATION WALLS FOR THE RESIDENTIAL ADDITION FOLLOWING FORMWORK REMOVAL. CONSTRUCTION SHOW STRUCTURAL LAYOUT, WALL ALIGNMENT, AND INTEGRATION BENEATH THE EXISTING STRUCTURE.
Foundation Formwork for Home Addition
Work on the footings and foundation formwork installed for the new residential addition prior to concrete placement. The layout defines structural boundaries, load points, and integration with the existing structure.
Existing Deck and Addition Conditions
the pre-construction condition of the existing deck, stairs, and enclosed under-deck area prior to renovation. The photos highlight structural wear, outdated materials, and limited functionality requiring full reconstruction.
Residential Addition Roof Framing Progress
New rafters were placed to establish roof slope and span over the framed addition. Tie-in connections were prepped for hardware, blocking, and sheathing installation.