Full foundation prep completed with installed rebar and formwork. Plumbing risers positioned at strategic locations for vertical connections.

Rebar grid installed over vapor barrier in a prepared foundation slab. Form boards and riser pipes are in place for inspection before pour.
Full foundation prep completed with installed rebar and formwork. Plumbing risers positioned at strategic locations for vertical connections.

Foundation trenching is underway with visible plumbing rough-ins and framing boards outlining the slab layout for a new home addition.

Foundation trenching is underway with visible plumbing rough-ins and framing boards outlining the slab layout for a new home addition.
Rear view shows full trenching, perimeter boards, and vertical pipes set in preparation for concrete slab pour on a residential addition.

Foundation prep captures excavation, demolition, and foundation layout with visible formwork preparation and trenching. The images show structural integration with framing elements in an active residential addition.

Freshly excavated foundation pit with full perimeter formwork staged for concrete pour and string lines in place for layout.
Construction site showing new foundation layout and partial wall framing in progress, with dirt piles and framing materials staged.


Wide view of full foundation prep, edge trenches, and formwork aligning with structural plywood and framed walls in background.
Rear elevation showing structural wall removed and new formwork installed for extended concrete footing under crawl space.

CONVERT THE DETACHED GARAGE INTO A RECREATION ROOM

Convert the detached garage into a recreation room; add a bedroom, bathroom, and closet on the second floor; add a staircase, laundry area, study, and hallway connecting the existing house to the converted garage.

Exposed wall framing inside detached garage during recreation room conversion

A concrete slab separates the existing house from the opened detached garage during home-addition construction.

Concrete slab between house and detached garage during addition construction

Concrete foundation work

A newly poured concrete slab now fills the excavated footprint between the existing house and detached garage. The slab establishes the foundation for the rooms and passage connecting the two structures.

Newly poured connector slab between existing house and detached garage
New concrete connector slab with utility penetrations between house and garage

Interior demolition

garage’s wood framing, window openings, and concrete floor before new construction begins. The open roof provides access for the planned addition work above and around the converted space.

Open-roof garage interior with exposed framing during recreation room conversion
Exposed garage window wall framing during recreation room conversion

Excavation clears the footprint between the existing house and detached garage for the new connecting addition.

Site preparation advances for the addition that will unite the residence with the converted garage. The cleared footprint extends along the house wall and across to the garage opening.

005 house wall excavation
Wide excavated addition footprint beside existing two-story house
Open detached garage beside excavation for new house connection

H2

TEXT

placeholder image
placeholder image
placeholder image

THE INITIAL INSPECTIONS, DEMOLITION, AND PREPARATION FOR A LARGE ADDITION.