INTERIOR DRYWALL WORK HIGHLIGHTING WALL PANELS, TAPED JOINTS, AND FRAMED OPENINGS. A2M CONTRACTORS CAN OBSERVE TAPED SEAMS, WALL COVERAGE, AND LAYOUT ALIGNMENT.
Interior Staircase Construction staircase construction during a remodel, focusing on framed stringers, step layout, and adjacent walls.
Exterior Stucco FinisH capturing exterior progress with stucco applied and window installations completed. The set highlights the finished façade and roofing details during construction.
Shower Framing and Waterproofing – Residential Remodel These photos show a bathroom remodel, focusing on shower framing, waterproof cement board, and wall preparation. Here are some stages of drywall finishing and waterproofing around the shower area.
Interior Drywall Progress showing the progression of drywall installation, from panels being hung to joints being taped and mudded. also the feature finished drywall with even surfaces and neatly finished corners.
These construction photos show an active stucco installation on the exterior and batt insulation being installed throughout the interior. Scaffolding, staging, and materials used for various stucco application.
Interior room with installed batt insulation between framing. Installer on ladder placing batt insulation in ceiling framing.
Batt insulation around framed wall with sliding glass door opening
Shower Framing and Waterproofing stage of construction shows a residential bathroom with fully framed walls, exposed ductwork, and electrical rough-in. The shower base has been coated with a waterproofing layer, preparing the space for future tile installation.
Interior Rough Framing Progress shows the rough framing, plumbing layouts during residential construction. HVAC ducts, wall studs, and floor markings are visible throughout the project.
here is the interior mechanical work during rough-in stages, including HVAC, electrical, and shower bench framing. These images help clients understand what’s behind the walls before finishes are installed.
key stages of stucco preparation on a new two-story home, including scaffolding, lath application, and wall sheathing. Designed for residential contractors, it highlights framing accuracy and envelope readiness prior to exterior finishes.
THE INTERIOR MECHANICAL WORK DURING ROUGH-IN STAGES, INCLUDING HVAC, ELECTRICAL, AND SHOWER BENCH FRAMING. THESE IMAGES HELP CLIENTS UNDERSTAND WHAT’S BEHIND THE WALLS BEFORE FINISHES ARE INSTALLED.
Interior framing with vertical studs and electrical conduit installed. OSB sheathing and rough wiring.
Front exterior of the two-story home under construction with exposed OSB sheathing and an open garage entry.
This set shows the two-story home mid-construction, detailing sheathing, framing, HVAC ducts.
the front and side angles of a newly framed two-story residence. It highlights the plywood sheathing, rough window installations, and temporary site access during structural framing.
Interior framing corridor view with open walls, truss ceiling, and visible structure spans.
Interior framing with exposed ceiling joists and newly installed dual windows, showing roof cutout for skylight or ventilation.
H2 Title
The project advances with key framing milestones — including stairs, access points, and hallway layout. Everything is framed and staged for inspection and next-phase mechanical installs.
title
Wide interior framing view shows floor joists overhead, wall studs throughout, and an unfinished staircase at left. Material piles, plumbing stub-out, and electrical conduits are visible across the slab and perimeter.
H2 Title
Residential framing, ceiling trusses, and utility layouts.
Ceiling trusses on the job site.
BEGINNING STAGES OF BUILDING THE CONVENTIONAL WOOD FRAMING.
Our team has been working on this residential concrete foundation slab, including visible plumbing risers, recessed footing areas, and smooth concrete finishing throughout the site.
We’ve completed the initial concrete foundation pour, laying the groundwork for a new residential build. These photos show the precise slab work that ensures long-term strength and quality.
Residential foundation excavation showing wooden formwork setup
Construction site excavation showing the framing for the foundation walls.
title
EXCAVATION SITE WITH CONSTRUCTION EQUIPMENT AND DIRT PILES. CLEARED CONSTRUCTION SITE WITH MINI EXCAVATOR AND TRENCHING. WIDE VIEW OF EXCAVATION AREA preparing the ground pad for the structure.
Excavation site with construction equipment and dirt piles. Cleared construction site with mini excavator and trenching. Wide view of excavation area with dirt and machinery
A construction site with initial site preparation for a potential building project, featuring leveled soil with visible grading and compacted tracks, surrounded by trimmed hedges and nearby structures. Workers installing temporary chain-link fencing around a construction site, following safety and security protocols for restricted access, with visible equipment and prepared soil in the background.
THE SLIDES SHOW the work has begun on this home remodel Residential construction site. showing a new plywood sheathing, an open sliding door frame, and exposed framing for an addition. An interior renovation project showing exposed wooden framing, insulation, and electrical wiring in progress.
A PARTIALLY RENOVATED HOME INTERIOR in progress with exposed wooden studs, ceiling insulation, and visible electrical wiring. The floor is covered with drywall debris, and construction materials are scattered throughout, including doors and tools.
Rooms under renovation have exposed framing, removed subfloors, and visible wiring and plumbing lines, showcasing the scope of the work ahead.
title
OUR TEAM AT A2M CONTRACTORS with subcontractors are on-site discussing a new project. stay tune for details on this two-story home construction.