Full foundation prep completed with installed rebar and formwork. Plumbing risers positioned at strategic locations for vertical connections.
Foundation trenching is underway with visible plumbing rough-ins and framing boards outlining the slab layout for a new home addition.
Foundation prep captures excavation, demolition, and foundation layout with visible formwork preparation and trenching. The images show structural integration with framing elements in an active residential addition.
Front elevation shows the existing garage and entry area before renovation.
Residential patio area with concrete removed, exposing foundation prep area.
Framing and Rough-In Progress
The framing and electrical rough-in phase reveals the project’s structural layout and in-wall systems. Wiring, junction boxes, and framing alignments are finalized before closing the walls.
This phase shows roof framing progress
structural beams are being installed across the new addition. The framing crew is aligning each joist for proper load distribution before roof sheathing begin
Framing and sheathing in progress
showing new wall construction next to the existing house.
Exterior Wall Sheathing – OSB InstallatioN
Newly framed and OSB-sheathed exterior wall. Stacked lumber is staged and ready for installation in the next phase.