A2M Contractors

General Contractor & Licensed Roofer

B & C 39 License #952120

One story detached ADU with 2 Bedrooms, 2 Baths

Bathroom Rough-In and Framing Stage
Bathroom under construction with exposed insulation, installed shower pan, and primed drywall awaiting moisture-resistant board and tile installation.

Bathroom framing with shower pan
Unfinished bathroom under construction

Interior Drywall – Prime and Prep Stage 
Hallway view leading into a freshly drywalled room with vaulted ceiling, window opening, and unfinished concrete floor—walls primed and ready for paint.

Unfinished drywall hallway view.
Interior room with primed drywall

Front Entry – In-Progress Build
Unfinished front entry under construction with unpainted sheathing, board-and-batten trim, porch roof framing, and installed door with sidelight.

Unfinished front entry under construction with unpainted sheathing.

Exterior siding and TYVEK’s house wrap.  also showing new window installation.

Exterior siding fully installed with windows in place.
Siding installation underway over Tyvek house wrap.
Exterior siding and house wrap showing window trim detail.

Drywall installation completed — taped, mudded, sanded, and prepared walls and ceiling for primer.

Interior drywall installation completed with recessed ceiling lighting.

The exterior walls are wrapped with Tyvek HomeWrap to protect against moisture intrusion during framing. This step is critical to protect the framing and prep the exterior for siding.

Exterior wall wrapped with Tyvek moisture barrier during framing and waterproofing preparation.
Corner view of residential framing with Tyvek wrap installed and windows set for siding preparation.

Interior Drywall Installation panels have been installed and taped throughout the interior space. Joint compound has been applied to seams and corners, preparing the walls for final finishing.

0142_drywall taped ceiling finish
Bathroom drywall installed with taped seams and plumbing rough-ins, ready for finishing.

Bathroom Wall Framing and  Fiberglass INSULATION are fitted between wall studs to improve energy efficiency. The plumbing and framing layout is visible, preparing the space for drywall.

Bathroom wall insulation installed with plumbing and window framing visible before drywall installation.
Insulated shower wall framing with fiberglass and mineral wool for moisture and sound control.

Wall Framing Progress show wall framing progress highlighting stud layout, structural bracing, and framed openings. These photos focus on the plumbing pipes and the electrical wiring in the open wallS.  

Remodel progress showing wall studs and framed openings.
Interior remodel showing aligned wall framing and bracing.
Wall framing progress highlighting stud layout and framing connections.
0109_wall framing installation remodel
Remodel progress with framed door and wall openings visible.
0112_home renovation framing stage

Window Frame Installation highlighting the flashing in between the exterior wall sheathing and the vinyl window frames.  this is an imporant step to insure a water proff seal.

Framed window opening with secured placement during remodel.
Remodel progress showing aligned window frame in wall opening.
Residential remodel with framed window secured in place.
Window framing progress inside residential renovation project.
Detailed view of window frame installation during remodel.

 exterior walls  with OSB sheathing, window and entry door opening cutouts, and fascia installed along the roof perimeter.

Wide-angle view of framed construction site.

Concrete Slab and Wall Framing. This set captures newly set concrete flooring with interior wall framing and ceiling structures in place. also includes plumbing rough-ins, framed openings, and slab finished floor.

Framed window opening and wall studs.
 Construction progress of interior wall framing shown clearly..
Room entry framing and adjoining walls in active construction.

Residential Framing Progress This phase of construction shows a residential structure with wall studs, roof rafters, and slab foundation in place. The open framing highlights progress before exterior sheathing and interior systems are installed.

Panoramic view of residential framing with roof rafters, wall studs, and open slab foundation during construction.

Residential Framing Progress showcases the structural framing and OSB sheathing of a residential project. Images highlight stud walls, ceiling joists, and window openings essential for a contractor's review.

Open interior framed space showing multiple rooms and concrete flooring.
Interior framing view showing wood studs and ceiling joists on concrete slab
Interior framing view showing wood studs and ceiling joists on concrete slab
Narrow hallway framed with wooden studs and open ceiling rafters.
Open interior framed space showing multiple rooms and concrete flooring.

Framed opening sheathed with OSB panels and black grid lines

Exterior wall sheathed with OSB panels and black grid lines
Framed opening sheathed with OSB panels and black grid lines

Framing Progress – Residential Construction shows the sequential process of wood framing a residential structure, including wall layout, window openings, roof joists, and crew work on-site.

Construction crew works atop the framed roof, completing sheathing under a clear sky.
** Interior view shows evenly spaced ceiling joists extending over open wall framing
Wide shot shows full interior framing layout with wall studs and exposed ceiling joists
View through framed window cutouts shows partially completed walls and ceiling joists
Wooden framing with multiple doorways and concrete floor foundation.

the early framing stage of residential wall construction using vertical studs anchored to a concrete slab. It highlights precision alignment of top plates and load-bearing supports. 

Residential new construction featuring top plate layout and vertical stud framing for an exterior load-bearing wall on a slab foundation.
Contractors work on wall framing for a single-family home, surrounded by fresh lumber, tools, and a partially erected wood frame.
Workers begin framing the exterior walls of a new residential home, with scattered lumber piles and palm trees in the background.
Framers begin wall layout over slab while lumber is staged and vertical plates are secured.
Framing progress shows top plates and wall studs fully assembled along all sides.
Interior view of active wall framing with tools and materials staged on slab floor.

Foundation prep is underway with rebar grid secured over vapor barrier. Wood formwork is reinforced and plumbing rough-ins are visible across the slab area.   The site is prepped for concrete pour within framed perimeter forms.

Wider view of the prepared construction site including gravel-filled foundation, wooden forms, portable toilet, and light equipment.
Foundation prep is underway with rebar grid secured over vapor barrier. Wood formwork is reinforced and plumbing rough-ins are visible across the slab area.

the early stages of a residential construction foundation, highlighting trenching, plumbing installation, and wood formwork setup for concrete pouring. Gravel has been compacted in the framed layout, and underground piping is staged prior to slab work.

Framed foundation area with gravel base and visible sewer line, water lines, and trench work.
Foundation footing layout with wood formwork and gravel base prepped for plumbing install.
Rebar installation spans the entire foundation with drainage and plumbing systems in place. The site is prepped for concrete pour within framed perimeter forms

here is a closer look at the concrete formwork with reinforced bracing along the trench perimeter, built to support a new foundation. The trench cut and angled support system suggest this is a stabilized footing area prepared for a slab or stem wall pour.

Wooden Stairway to Second Floor in Home Addition

the focus is entirely on groundwork and initial preparation. The project has clearly defined trenches or excavations with temporary wooden stakes or markers, and visible elevation differences suggesting careful grading or leveling work is underway.

excavation area with dirt and machinery

the early stages of site preparation, showing trenching, soil grading, and compacting work using a Bobcat track loader. Clear views of utility trenches, soil piles, and machinery access indicate foundational groundwork in progress.

Bobcat equipment grading soil during early site prep work.
Wide view of job site showing earthwork and Bobcat grading.

Open backyard space with construction site preparation for an accessory dwelling unit.  The ADU plans show an independent residential dwelling unit located on the same lot as a stand-alone (i.e., detached) single-family home.

Open backyard space with construction site preparation for an ADU

Excavation site with construction equipment and dirt piles. Cleared construction site with mini excavator and trenching. Wide view of excavation area with dirt and machinery

Excavation site with construction equipment and dirt piles
Cleared construction site with mini excavator and trenching

A construction site with initial site preparation for a potential building project, featuring leveled soil with visible grading and compacted tracks, surrounded by trimmed hedges and nearby structures.  Workers installing temporary chain-link fencing around a construction site, following safety and security protocols for restricted access, with visible equipment and prepared soil in the background.

Ground site preparation for two story home.
chain-link fencing for safety and security protocols

 THE SLIDES SHOW the work has begun on this home remodel Residential construction site. showing a  new plywood sheathing, an open sliding door frame, and exposed framing for an addition.  An interior renovation project showing exposed wooden framing, insulation, and electrical wiring in progress.

A PARTIALLY RENOVATED HOME INTERIOR in progress with exposed wooden studs, ceiling insulation, and visible electrical wiring. The floor is covered with drywall debris, and construction materials are scattered throughout, including doors and tools.

Ground site preparation for two story home.
chain-link fencing for safety and security protocols

Rooms under renovation have exposed framing, removed subfloors, and visible wiring and plumbing lines, showcasing the scope of the work ahead.

Room under renovation with exposed framing, subfloor removed, and visible wiring.
Narrow room in mid-renovation with exposed studs, wiring, and plumbing.
Partially renovated room with exposed wall studs and a window centered in the back wall.
Narrow room in mid-renovation with exposed studs, wiring, and plumbing.

title

placeholder image
placeholder image
placeholder image
Home Advisor Elie Service -A2M Contractors
home advisor-a2m
Home Advisor - A2M Contractors