Bathroom Rough-In and Framing Stage Bathroom under construction with exposed insulation, installed shower pan, and primed drywall awaiting moisture-resistant board and tile installation.
Interior Drywall – Prime and Prep Stage Hallway view leading into a freshly drywalled room with vaulted ceiling, window opening, and unfinished concrete floor—walls primed and ready for paint.
Front Entry – In-Progress Build Unfinished front entry under construction with unpainted sheathing, board-and-batten trim, porch roof framing, and installed door with sidelight.
Exterior siding and TYVEK’s house wrap. also showing new window installation.
Drywall installation completed — taped, mudded, sanded, and prepared walls and ceiling for primer.
The exterior walls are wrapped with Tyvek HomeWrap to protect against moisture intrusion during framing. This step is critical to protect the framing and prep the exterior for siding.
Interior Drywall Installation panels have been installed and taped throughout the interior space. Joint compound has been applied to seams and corners, preparing the walls for final finishing.
Bathroom Wall Framing and Fiberglass INSULATION are fitted between wall studs to improve energy efficiency. The plumbing and framing layout is visible, preparing the space for drywall.
Wall Framing Progress show wall framing progress highlighting stud layout, structural bracing, and framed openings. These photos focus on the plumbing pipes and the electrical wiring in the open wallS.
Window Frame Installation highlighting the flashing in between the exterior wall sheathing and the vinyl window frames. this is an imporant step to insure a water proff seal.
exterior walls with OSB sheathing, window and entry door opening cutouts, and fascia installed along the roof perimeter.
Concrete Slab and Wall Framing. This set captures newly set concrete flooring with interior wall framing and ceiling structures in place. also includes plumbing rough-ins, framed openings, and slab finished floor.
Residential Framing Progress This phase of construction shows a residential structure with wall studs, roof rafters, and slab foundation in place. The open framing highlights progress before exterior sheathing and interior systems are installed.
Residential Framing Progress showcases the structural framing and OSB sheathing of a residential project. Images highlight stud walls, ceiling joists, and window openings essential for a contractor's review.
Framed opening sheathed with OSB panels and black grid lines
Framing Progress – Residential Construction shows the sequential process of wood framing a residential structure, including wall layout, window openings, roof joists, and crew work on-site.
the early framing stage of residential wall construction using vertical studs anchored to a concrete slab. It highlights precision alignment of top plates and load-bearing supports.
Foundation prep is underway with rebar grid secured over vapor barrier. Wood formwork is reinforced and plumbing rough-ins are visible across the slab area. The site is prepped for concrete pour within framed perimeter forms.
the early stages of a residential construction foundation, highlighting trenching, plumbing installation, and wood formwork setup for concrete pouring. Gravel has been compacted in the framed layout, and underground piping is staged prior to slab work.
here is a closer look at the concrete formwork with reinforced bracing along the trench perimeter, built to support a new foundation. The trench cut and angled support system suggest this is a stabilized footing area prepared for a slab or stem wall pour.
the focus is entirely on groundwork and initial preparation. The project has clearly defined trenches or excavations with temporary wooden stakes or markers, and visible elevation differences suggesting careful grading or leveling work is underway.
the early stages of site preparation, showing trenching, soil grading, and compacting work using a Bobcat track loader. Clear views of utility trenches, soil piles, and machinery access indicate foundational groundwork in progress.
Open backyard space with construction site preparation for an accessory dwelling unit. The ADU plans show an independent residential dwelling unit located on the same lot as a stand-alone (i.e., detached) single-family home.
Excavation site with construction equipment and dirt piles. Cleared construction site with mini excavator and trenching. Wide view of excavation area with dirt and machinery
A construction site with initial site preparation for a potential building project, featuring leveled soil with visible grading and compacted tracks, surrounded by trimmed hedges and nearby structures. Workers installing temporary chain-link fencing around a construction site, following safety and security protocols for restricted access, with visible equipment and prepared soil in the background.
THE SLIDES SHOW the work has begun on this home remodel Residential construction site. showing a new plywood sheathing, an open sliding door frame, and exposed framing for an addition. An interior renovation project showing exposed wooden framing, insulation, and electrical wiring in progress.
A PARTIALLY RENOVATED HOME INTERIOR in progress with exposed wooden studs, ceiling insulation, and visible electrical wiring. The floor is covered with drywall debris, and construction materials are scattered throughout, including doors and tools.
Rooms under renovation have exposed framing, removed subfloors, and visible wiring and plumbing lines, showcasing the scope of the work ahead.